Home ProductsMarine propulsion system

Forged Steel Marine Propeller Shaft/Ship Shaft / Long Tail Boat Shaft

Good quality Marine deck equipment for sales
I'm Online Chat Now

Forged Steel Marine Propeller Shaft/Ship Shaft / Long Tail Boat Shaft

China Forged Steel Marine Propeller Shaft/Ship Shaft / Long Tail Boat Shaft supplier

Large Image :  Forged Steel Marine Propeller Shaft/Ship Shaft / Long Tail Boat Shaft

Product Details:

Place of Origin: Jiangsu
Brand Name: CCME
Certification: ABS CCS BV KR DNV etc
Model Number: CCME

Payment & Shipping Terms:

Minimum Order Quantity: 1
Price: negotiable
Packaging Details: standard packaging
Delivery Time: per to your requests
Payment Terms: T/T L/C
Supply Ability: 10 per month
Minimum Order Quantity: 1
Detailed Product Description
Torque Capacity: Depends On Model Material: Steel
Size: Optional

The details of marine propeller shaft as follows,
1.Material:H13,4130,4140,4150,4340,1035,1045,EN9,EN19,EN24,EN31,51200,SUJ2,100Cr6,K310,34CrNiMo6,36CrNiMo4,42CrMo4,86CrMoV7, C35E, C40E, C45E, etc.
2.Hardness: HB240-320
3.Ultrasonic Test: Sep 1921-84 - Test Group 3 Class D or ASTM A388 - FBH max 4mm
4.Forging reduction ratio: ≥4
5.Manufacturing process: steel ingot→forging→rough machining→QT→2th rough machining→finishing machining→packing→delivery
6.Quality required: Surface defect and decarburization shall be free. All dimensions are 100% OK.
7.Packing: wooden box or metal pallet for protection against rust and damage.
8.Quality Management Certification: ISO 9001:2008.


 

Product Name Specification Main Materials
marine propeller shaft Dia.80~ Dia.1500mm
Length≤12000mm
H13,4130,4140,4150,4340,
EN9,EN19,EN24,EN31,etc

  1. Marine Forged Propeller Shaft

    1. materials: Carbon steel Carbon manganese steel Alloy steel
    2. length: max 14m
    3. weight of single piece: 3 ton to 40 tons
    8. certifications: ISO9001 CCS ABS BV LR etc.
    5. ISO9001 : certified
    6. 4000T advanced hydraulic pressure machine
    7. test: 100% Ultrasonic flaw detection test
    8. production capacity: 20,000 tons per year
    9. delivery time: according to the quantity and size, usually within 35 days.
    10. Forging way:free forging
    11.Flange diameter: max2.3m

Mooring Chock,EU Type Deck Mounted Towing Chock

You may sent us inquiry by bellow mail,thanks!
Master@ccmemarine.com

 

Contact Details
China Century Marine Equipment Co., Ltd

Contact Person: Holad

Tel: 86-23-86805761

Fax: 86-23-86803592

Send your inquiry directly to us (0 / 3000)